At a glance

  • Collect electricity consumption in kWh, not just the amount paid.
  • Describe when the guesthouse uses electricity, including seasonal occupancy changes.
  • Enquire with what you have; missing information can become part of the assessment.

You do not need a finished system design to ask for a solar proposal. Start with your island, the property and your goal. A few supporting details then help make the discussion about your actual guesthouse rather than a generic panel package.

The checklist below is our suggested preparation for an initial enquiry. It is not a requirement to purchase, and incomplete records should not stop you from speaking to us.

Bring the energy figures behind the bill

If available, gather the last 12 months of bills so busy and quiet periods are visible. Mark consumption in kWh separately from the total payment. The US Department of Energy’s solar preparation guide recommends reviewing previous bills and considering changes in future demand. Those principles are useful here; the guide’s US incentives and permitting arrangements do not apply to a Maldives proposal.

Tell us which supply serves the property and whether one bill covers several buildings or businesses. If you have only a few months of records, include them and explain what was happening at the time. A low-occupancy month should not silently become the whole-year baseline.

  • Monthly kWh and billing dates, with the current energy tariff where shown.
  • Property name, island and the buildings included in the enquiry.
  • Occupancy changes, planned rooms or equipment changes that affect future use.
  • For generator-based supply, recent delivered fuel invoices and existing fuel or generation records, if available.

Explain what happens during the day

An annual energy total does not show whether solar production and demand coincide. Describe the normal routine for cooling, laundry, kitchens, pumps and other major loads. Say which uses are continuous and which happen mainly at night. A rough operational description is a useful start; representative meter data can later sharpen it.

The Australian Government’s solar consumer guide explains the benefit of using solar electricity while it is being generated and of reviewing monitoring data. For a guesthouse, the practical question is whether suitable tasks can overlap with generation without disrupting guests, hygiene or operations. Its Australian seasonal hours and tariff advice are not local rules.

Do not assume that every load can be moved to midday. In the enquiry, distinguish flexible tasks from essential service requirements. Changes to controls or electrical circuits need assessment by a qualified professional.

Give us the site context

Describe roof material, approximate age, any known leaks or planned roof work, and nearby obstructions. Include existing drawings if you have them. Photos taken from the ground or another safe accessible place can support the first conversation; you do not need to climb onto the roof.

Note access restrictions, guest-sensitive working hours and how equipment can reach the property. If you already own solar, share the system size, equipment model names and an example of the issue or monitoring alert. A roof and electrical review must still confirm what is feasible.

Ask for a proposal you can compare

State your priority: reducing purchased electricity, reducing diesel use, installing a new system or improving care for existing solar. If you want backup power, say so explicitly. It requires a separate design discussion; solar panels alone should not be treated as a backup promise.

When a proposal arrives, check that it identifies equipment, delivery and installation scope, the energy assumptions, operating costs and the approvals to confirm. Ask what is included in aftercare, what is excluded and what information still needs verification. Keep the same baseline when comparing options so a larger savings number is not simply the result of different inputs.

Our savings calculator can help you explore a starting case. You can also skip it and request a proposal directly.

Sources & further reading

Primary references checked on 1 October 2026. International guidance supports the general principles; site design, service terms and Maldives connection requirements need local confirmation.